Megarob Project on TVE
3D Animation of the Final Demonstrator
This video shows an animation of the Final Deomnstrator which will be developed and installed in AITIIP Facilities (www.aitiip.com) during 2015 for the Factories of the future FP7 MEGAROB Project (contract number 314015). A windmill blade is being worked on this animation.
Robot Position Correction in Realtime using Laser Tracker
Prototype developed and installed in CSEM Alpnach (www.csem.ch) for the Factories of the future FP7 MEGAROB Project (contract number 314015) showing robot position correction in realtime using Laser Tracker, allowing a high precision manufacturing with industrial robots mounted in rails or cranes.